System construction method Product List and Ranking from 4 Manufacturers, Suppliers and Companies

System construction method Product List

1~4 item / All 4 items

Displayed results

Pipeline processing system, pipeline processing system construction method.

It is a mixing system that enables various treatments such as solidification, dehydration, bubble-mixed soil, and contaminated soil!

The piping processing system is a technology centered around a piping mixer, combined with powder supply devices and specific gravity adjustment equipment, which adds and mixes powdered or liquid additives (such as hydrophobic agents, flocculants, solidifiers, foaming agents, bentonite, etc.) into construction-generated soil like mud and dredged soil during the piping pressure delivery process.

  • Bentonite
  • Other civil engineering works

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Introduction to the "Cyclic Hybrid Blast System Method"

We will significantly reduce industrial waste emissions and contribute to environmental measures!

At Iyamato Total Bridge Support Co., Ltd., we offer the "Circulating Hybrid Blast System Method," which significantly reduces industrial waste by recycling abrasive materials. By completely separating the abrasive material from the paint film, we can process only paint films containing lead, PCBs, and other hazardous substances. Additionally, the operation is simplified for anyone through the use of an electronic control panel (fully automated). 【Features】 ■ Capable of construction not only for bridges but also for pedestrian bridges and supports where machine installation is difficult. ■ Simultaneous collection is possible. ■ Can be operated in locations where scattering protection is difficult, using a vacuum function. *For more details, please download the PDF or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

YRK system construction method

We introduce a revolutionary system that replaces it with a transparent special one-component urethane resin!

Introducing the 'YRK System Method' using the tile surface transparent coating stripping agent "Platinum Z." This method involves the removal of a transparent coating, such as acrylic emulsion-based (fiber-reinforced) resin, that has been in place for over 10 years, which was applied as a method to prevent the peeling of exterior wall tiles. It is a revolutionary system that replaces it with a new transparent special single-component urethane resin that has high coating durability. 【Features】 ■ Uses the tile surface transparent coating stripping agent "Platinum Z" ■ Removes a transparent coating, such as acrylic emulsion-based (fiber-reinforced) resin, that has been in place for over 10 years, applied as a method to prevent the peeling of exterior wall tiles ■ Replaces it with a new transparent special single-component urethane resin that has high coating durability *For more details, please refer to the PDF document or feel free to contact us.

  • Safety and consumables
  • Tile work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

TDR shot lining system method (mortar wet spraying method)

Corresponds to various sharp curves! A construction method for clients who want to reduce costs or shorten construction time.

The "TDR Shot Lining System Method" is a secondary lining construction system for shield steel segment sections. It responds to needs such as "wanting to fill steel segments in shield tunnels with sharp curves," "wanting to shorten construction time," and "wanting to increase construction speed." By introducing this method, it can accommodate sharp curve sections that are difficult to construct with conventional methods, and it can fill various areas of steel segments, achieving high density. 【Benefits of Implementation】 ■ Achieved approximately 1.7 times construction progress - T Construction Co. ■ Able to handle sharp curve sections that are difficult to construct with conventional methods ■ Can fill various areas of steel segments, resulting in high density *For more details, please refer to the related links or feel free to contact us.

  • Renovation and repair methods
  • Civil Engineering Method
  • Tunnel construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration